One Project is not enough
After re-coating the foredeck around the deck islands in 2007, Frank and me decided to „open“ another construction site – the cockpit. The applied teak deck and the plywood underneath had suffered badly in the past decades. As shown on the pictures below, we even had to replace parts of the plywood structure. Although massive, the teak wood cover could not be saved and had to to go. However, this was the opportunity to adapt the propane gas locker to European bottle size. Compared to US standard the European bottles are considerably bigger.